Piling Finished
The step profile with a Coffer Dam at the end (left). This dam is to enable the team to dig out a hole for concreting and prevent the sides of the hole from col...
Read more
The step profile with a Coffer Dam at the end (left). This dam is to enable the team to dig out a hole for concreting and prevent the sides of the hole from collapsing inwards. For information, the sheet piles will not be seen afterwards, it will all be covered either by pre-fabricated concrete or a concrete pad in the case of the run-out at the bottom.