chuckgordon
FollowThe Age of Man
Built 1914-17 under the direction of Gustav Lindenthal, opened to railroad traffic July 31, 1917Builders- David B. Steinman (Design Engineer)
- Dravo Con...
Read more
Built 1914-17 under the direction of Gustav Lindenthal, opened to railroad traffic July 31, 1917Builders- David B. Steinman (Design Engineer)
- Dravo Contracting Co. of Pittsburgh, Pennsylvania
- Gustav Lindenthal (Lead Engineer)
- McClintic-Marshall Co.
DesignContinuous subdivided Warren through truss bridge with deck truss approach spans (each 152.5 feet long) and plate girder viaducts (north approach 822 feet, south approach 1062 feet)Dimensions Length of largest span: 775.0 ft.
Total length: 3,400.0 ft. (0.6 mi.)
Deck width: 38.8 ft.
Read less
- Dravo Contracting Co. of Pittsburgh, Pennsylvania
- Gustav Lindenthal (Lead Engineer)
- McClintic-Marshall Co.
DesignContinuous subdivided Warren through truss bridge with deck truss approach spans (each 152.5 feet long) and plate girder viaducts (north approach 822 feet, south approach 1062 feet)Dimensions Length of largest span: 775.0 ft.
Total length: 3,400.0 ft. (0.6 mi.)
Deck width: 38.8 ft.
Read less
Views
715
Likes
Awards
Outstanding Composition
Superb Composition
Peer Award
Top Choice
Absolute Masterpiece
Outstanding Creativity
Jaw Dropping
Exceptional Contrast
Great Find
All Star
Magnificent Capture
Superior Skill
Categories
amma65
April 04, 2013
Love the perspective, reminds me of one of my favourite films...Bridges over Madison County!
Same photographer See all
Discover more photos See all